translated from Spanish: City Council reported that lobby approved more public work in Morelia

Morelia, Michoacán.- Through a statement it has been reported that the Cabildo de Morelia approved in extraordinary session by majority the initial Annual Investment Program (MYP) 2020 by the order of 332 million 405 thousand 095 pesos to carry out more public works for the municipality with 102 actions that contemplate the rural area and the colonies that need it most , with electrifications, lighting and works of hydraulic, social, public spaces and mobility infrastructure, as well as attention to gender-based violence.
In addition, the amendment and reduction was made to the Revenue and Budget of Egress for the 2020 financial year to leave the municipality a budget ceiling of 2 billion 389 million 111 thousand 123 pesos, a reduction of 19 million 21 thousand 444 pesos.
In this sense, the municipal president, Raúl Morón Orozco, highlighted the congruent attitude of the Cabildo, with actions such as more public works for the rural area and lagging colonies that will allow to solve specific problems.
It also looked forward to integrating in a subsequent amendment to the MYP 2020, a project that encompasses and includes federal and state resources to have comprehensive actions and that show the objective and direction of the development of the municipality for the present annuity in a clear way.
The PAI 2020 approved this afternoon in Cabildo will generate 102 public works for the development of Morelia, of which just over 54 million will be with its own resources and will generate 22 buildings, almost 174 million of the Contribution Fund for Municipal Social Infrastructure (FAIS) with 69 shares, more than 30 million of the Fund of Contributions for the Strengthening of Municipalities (FORTAMUN) with 8 works , and just over 74 million pesos from the State Contribution Fund for Municipal Public Service Infrastructure (FAEISPUM), corresponding to 3 registers.
Among the works of the FAEISPUM exercise 2020 stand out the construction of the side lanes of Villas del Pedregal, the construction of the fire station of the west in the Villas del Pedregal fraction, the reconstruction and adequacy of the Miguel Hidalgo sports unit, as well as a shelter for women that will allow to better cope with gender-based violence and care for the victims of it.
The Government of Morelia will allocate 26% of the MYP to the rural area with electrification actions, hydraulic infrastructure, mobility, such as: a water treatment plant in Uruapilla, works on the Cointzio dam, and a second stage of intervention on the way to Cointzio, to name a few.
Finally, the mayor, Raúl Morón recognized the responsibility taken by the Morelian Cabildo in the face of the contingency generated by the COVID-19 virus, the preventive measures implemented and supported in the municipal areas, public spaces, before which he advanced that these actions will be further reinforced in all The entrances of Morelia with health filters that include medical equipment for the health review of the people who enter and the corresponding temperature.

Original source in Spanish

Related Posts

Add Comment